Got some more work done on the R last night. Final interior coat and cleaning, and got the bay prepped and taped up for the paint shop. Was able to get it scheduled for this coming weekend, so hopefully I have some fresh engine bay pics for you guys by this time next week!
I need to figure out the best way to go forward from here? Im going to drop the front rack and subframe and rebuild all of that, put an engine in for getting everything wired and put back, but from there what should be my next step? I feel like I shouldnt do the interior, since the whole caR will be painted with the doors off and the windows out. I feel like I can reassemble the dash and electronics, but no carpet, door panels, interior bits, or plastics should go in prior to paint? Or am I ok putting most of those things back in because they will tape everything off? I feel like I need to do everything I can before sending it to paint and body work on the outside. I'm sure I could have the whole interior back installed in a Saturday's time.
Anyone who has gone this far with a car or has been in this position, I would love any input or feedback on the best way to progress through this process. Thanks in advance for the help!